How it works

Six steps. One team. About seven weeks.

You will always know what happens next, who is doing it, and when.

  1. 1

    Day 1-3

    Free home assessment

    A design specialist reviews your roof with satellite imagery and your last 12 bills, then confirms on-site if needed. No pressure, no pushy follow-up.

  2. 2

    Week 1

    Design and fixed quote

    You get a 3D layout, expected output by month, and one fixed price. What we quote is what you pay, including permit fees and any panel upgrade.

  3. 3

    Weeks 2-5

    Permits and utility approval

    We file the building permit, HOA notice and interconnection application. Most Portland-area jobs clear in 2-4 weeks.

  4. 4

    Install day

    Installation

    A crew of four installs the racking, panels, inverters and battery. Typical home: one to two days, and we leave the roof cleaner than we found it.

  5. 5

    Weeks 6-8

    Inspection and switch-on

    The city inspects, the utility grants permission to operate, and we power up together. You get a walkthrough of the app before we leave.

  6. 6

    Every day

    Monitoring and care

    We watch every panel. If output dips we call you first. A free health check each year for five years is included.

Crew installing panels on a flat roof with a crane

Our own crews handle every install. We do not subcontract the roof work.

Before you ask

It converts your monthly bill into annual kilowatt-hours at $0.17 per kWh, sizes an array to cover about 95 percent of that, and limits it to what your roof can hold at roughly 55 sq ft per kW. Output per kW depends on sun exposure. Your written quote replaces these estimates with a design specific to your roof.